
Outlet components
Demo configurationComponent reference
Use these illustrations for identification. Verify the installed part before ordering or servicing.
Lubrication points
Flow · mL/cycleActive alarms
Channel flow
Channel alarm history
Alarm center
Cycle records
| Timestamp | Machine ID | Point | Cycle # | Flow (mL) | Pressure (psi) | Duration (s) | Result | Alarm code |
|---|
Timed diagnostic cycle
Runs all five simulated channels against the current configured flow targets and pressure limits.
Ready to run
Latest service report
Machine & sensor setup
Settings saved on this device only · readings are simulatedReservoir & outlet components
Enable installed pump outlets, then select and name one plunger per outlet. Record any PRVs and divider blocks on that outlet. Switch the five pump element channels on or off below.
Match each entry to the installed hardware. Verify the valve and its pressure rating from the exact pump and circuit documentation. Live valve status requires a mapped signal.
Global alarm limits
Pump element channels
Enable one channel for each monitored plunger.
Installed hardware & signal map
| Device / signal | Prototype source | Display / rule |
|---|---|---|
| Five line point monitors | Bijur Delimon or equivalent | Per-channel cycle volume, flow trend, missing/low/high flow |
| System pressure | 4–20 mA transmitter | High, low, unstable/spiking pressure; blockage correlation |
| Reservoir low / high | Discrete switches (high optional) | Low-level alarm; optional full indication |
| Pump run | Discrete run input | Running / stopped |
| Controller / display | Productivity1000 PLC · 7″ C-More HMI | Connection and tag mapping pending |
| Panel | 24VDC supply, Ethernet switch, DIN terminals, protection, NEMA 4X enclosure | Hardware reference; no software signal |
Future sensor expansion
Vibration monitoring · oil quality · filter differential pressure · cellular connectivity · cloud dashboard · predictive maintenance analytics. These are planned, not included in the prototype.